Global B2B Roll Forming Sourcing Platform | Free RFQ Response within 24h


A pure CTL line levels coil and transversely cuts sheets to length. A pure slitter longitudinally slits and recoils strips. A ZHJ combined host integrates both: it can slit/recoil and also cut to length on one machine layout. Combined slit/CTL lines are widely positioned as flexible service-center tools when both output forms matter 鈥?and as a compromise versus dedicated peak-speed lines when one form dominates.
Selection starts from the order book: sheets only, strips only, or both on one footprint. Combos are not 鈥渇ree upgrades鈥?to a pure CTL; they carry their own thickness, speed, strip-count, and motor bands.
If strip and sheet orders routinely compete for the same hours, dedicated parallel lines may still be clearer than forcing every job through one combo 鈥?confirm with real mix, not brochure versatility alone. Industry write-ups on combined lines likewise note lower peak efficiency versus dedicated hosts when volume is single-purpose.
| Configuration | Thickness / width reference | Speed / strips | Motor reference |
|---|---|---|---|
| Standard ZHJ combo | About 0.5鈥? mm; about 1300 mm class | 鈮?about 25 m/min; 鈮?about 8 strips | Total motor about 70 kW; hydraulic about 7.5 kW; arbor about 蠁150 |
| Emboss ZHJ variant | About 0.5鈥? mm (narrower strip count) | 鈮?about 15 m/min; 鈮?about 5 strips | Total motor about 81 kW class 鈥?slower/heavier than standard |
| Pure CTL (JPX example) | About 0.5鈥? mm; about 500鈥?500 mm | 鈮?about 30 m/min | Leveling about 55 kW class on that reference 鈥?not a ZHJ number |
Model naming conflicts exist on some ZHJ documents (for example thickness wording 0.3鈥? / 0.5鈥? / 0.3鈥?). Settle conflicts in the contract; do not publish one invented band.
Write the selection decision on the exit mix first; only then open the matching parameter tier.
Usually no. A pure CTL is the direct answer. Add ZHJ only if the same line must also produce recoiled strips.
Not always. Combos save footprint and capital count; dedicated lines can protect peak efficiency when one product form dominates volume. Match to your order mix.
No. Emboss variants run slower, with fewer strips and a higher motor total on the reference documents. Quote the named variant.
No. Keep each host鈥檚 evidenced band. Confirm final ratings on the technical proposal for the selected configuration.
Ratings follow the confirmed technical proposal. Price and lead time are out of scope. CMS suggestion: draft + needs_verification.