Produce metal roofing / cladding with an anti-condensation (anti-drip) felt layer bonded before forming, then cut and stacked for dispatch. This page is the short typical route for buyers. Detailed combo power breakdown sits on the laminate–form–cut–stack page; host ratings on the film equipment page.
Membrane makers note that high-efficiency plants integrate lamination into the roll-forming process so no separate post-forming bonding step is required on site.
Bonding the membrane on flat strip (or at a dedicated entry coating station) keeps adhesion controlled and reduces damage risk compared with trying to apply felt after complex profiling. Form tooling and shear blades must then be set so they do not scrape the felt face — confirm on the host proposal.
| Topic | Guidance |
|---|---|
| Film-only scope | Felt application without forming is a separate contract scope |
| Speed / kW | See the host page (about 0–20 m/min; main about 7.5; hyd about 5.5) |
No. This page is the short typical route. The combo page expands station roles and plant-power reading.
No. Color coating paints coil; this line bonds anti-drip felt then forms roofing profiles.
Only if the proposal removes it. The documented combination baseline includes stacker discharge.
On the anti-condensation felt equipment host page — not restated as a second datasheet here.
Process map only. Final ratings follow the confirmed proposal. Price and lead time: contact us for a quote.